Philippines only
NAYA · Financial Planning · Philippines

Revenue against running cost

The last part of the presentation: which revenue line pays for the platform in the Philippines, and which two are worth combining. Revenue is Part 2 and Part 3 from the decks on this site; Part 1 joins when Shayne's figures arrive. Cloud and infrastructure follow Alan's Production Infrastructure Cost Summary v3.1 (3 November 2026), now rebuilt into Kenny's 38-month IT sheet of November 2026. The cost side runs on our own scenario volumes with Kenny's unit rates. Indonesian figures are excluded throughout.

Revenue
—
—
Running cost
—
—
Contribution
—
—
Break-even
—
—

01 · What the platform actually costs

The simplified view of the information technology (IT) budget. Volumes come from our own scenarios; the unit costs come from Kenny's 38-month sheet. Change the two cost controls above and everything below moves.

Fixed platform cost
—
—
Per-placement cost
—
—
All-in cost per placement
—
—
Cost as a share of revenue
—
—

What one placement costs, all in

Where the money goes, month by month

Fixed platform — team, office, shared cloud, tools, security Per placement — AI, video, identity checks, cloud usage, passwords Marketing — my estimate, not costed by Kenny

Stress test — how wrong can the cost be before it matters

02 · What everybody else charges for the same paper

The question this section answers: the competition's prices, what is actually paid to the Philippine government, and what NAYA charges to process the same documents. Switch the Idea 2 price set control above and every figure on this page moves with it. Prices shown in the currency selected above.

Price set in use
—
—
Idea 2 revenue
—
—
Contribution after cost
—
—
Break-even
—
—

Every service, and what each earns a year

Every price point we could find

The one live, like-for-like price — and what the government actually takes

How much of this goes to the government

03 · Revenue against platform cost, month by month

Two scales. Revenue is read on the left, platform cost on the right — otherwise the cost line looks flat simply because it is the smaller number.

Revenue · left scale Platform cost · right scale

04 · Cumulative, and when it crosses

Everything earned against everything spent since month one. The crossing point is when the revenue line has paid back the platform.

Cumulative revenue Cumulative cost

05 · Which revenue line makes more sense

Contribution for every revenue line and scenario, against the same running cost.

Covers its running cost Does not cover it

06 · Which two combine best

The running cost is paid once however many revenue lines sit on it, so the second line is almost pure contribution. This is what combining is worth.

Idea 1, Shayne's share of the placement fee, has no figures yet. Its row is held open.

07 · Month by month

The full period behind the charts above, including the placements each month and the three parts of the cost.

08 · Sources

Where the volumes come from

  • Ours, not the IT team's. Agencies signed, and therefore placements, come from scenarios A, B and C in the Part 2 and Part 3 decks. Kenny is not in the loop on expected take-up, so his own placement curve is not used here.
  • 449,944 new-hire placements a year across 729 licensed agencies — 51.4 placements per agency a month at the published tier mix. Scenario B reaches 38% of that national market by month 36, scenario C 95%, because a mandate means every licensed agency.

Fixed platform cost — Kenny

  • NAYA IT Cost Projection, 38 months, November 2026. RM 9,206,530 over 36 months including set-up, which does not move with volume.
  • IT team salaries and statutory RM 7,880,950 over 38 months, artificial intelligence (AI) coding licences RM 439,200, Postman RM 47,200, office rental and utilities RM 448,640, co-working RM 9,455, Jira RM 14,174, the shared Amazon Web Services (AWS) platform RM 687,021, local graphics processing unit (GPU) machine RM 33,000 and penetration tests RM 400,000.
  • Headcount 3 at month 1, 12 by month 13, 16 by month 36, 20 by month 38. Market launches: Singapore month 13, Taiwan 19, Malaysia 25, Hong Kong 31, Saudi Arabia 37.
  • Kenny rebuilt the cloud line bottom-up from Alan's Production Infrastructure Cost Summary v3.1 of 3 November 2026, Scenario B, so the two IT sources no longer contradict each other. His AWS figure is now USD 214,393 over 38 months, which is 42% of Alan's Scenario C rather than the 16% it was.

Cost to serve one placement — Kenny

  • RM 24.30, about ₱375. AI and large language model calls RM 11.71, video interviews RM 10.24, know your customer (KYC) identity checks RM 1.71, cloud usage RM 0.48, one-time passwords RM 0.17.
  • Built on 4.76 worker registrations and 8.16 candidate interviews per placement. Each candidate sits two interviews, 30 minutes, two participants, on AWS Chime at RM 1.25 a candidate — 42% of the total.

Revenue

  • Idea 2, administration fee per submission, and Idea 3, agency subscription licence — the two monetisation decks, November 2026. Scenarios A and B are voluntary; C assumes the Department of Migrant Workers requires agencies to work through NAYA.
  • Built on 730 licensed land-based agencies and about 1.77 million document events a year.
  • Idea 3 can be priced two ways. Plan A is the four tiers by agency size, every peso contracted in advance. Plan B is a ₱3,000 a month access fee plus ₱280 for each placement (₱1,500 and ₱150 in Scenario A), of which 17% is guaranteed and the rest moves with deployment. The two land within two per cent of each other in every scenario, so the switch above changes who carries the risk, not how much NAYA earns.

Exchange rates and exclusions

  • Mid-market, 11 November 2026: $1 = S$1.282 and S$1 = ₱49.3. Ringgit at Kenny's own RM4.1 to the dollar.
  • Excluded by Alan: external AI APIs (~$171,000 over three years), interview SDK fees, non-production environments, local GPU hardware, SMS, email, push and indirect taxes. Excluded here: Idea 1, professional fees, regulatory capital and the Indonesian revenue side.

NAYA · internal financial planning · built 2026-11-12 · estimates for planning, not verified vendor quotations or audited forecasts.