NAYA · Monetisation · Philippines

How NAYA earns, and what it costs to run

Three revenue proposals for the Philippine business, each presented in full as its own deck, and then one financial projection that sets whichever ideas and scenarios NAYA adopts against the cost of actually running the platform. Prepared for the Philippine investor presentation.

Philippines only

Every figure on this site is Philippine. Indonesian volumes, agencies and revenue are excluded. Amounts are shown in Philippine pesos with the Singapore dollar equivalent beside them at S$1 = ₱49.30; the projection page lets you switch currency.

Part 1 of 4 · to follow

A share of the placement fee

A percentage of the fee the agency already charges. Scales with the value of each placement rather than with its paperwork.

Figures to follow
Owner: Shayne
Part 2 of 4 · 37 slides

The administration fee

A fee for each document NAYA prepares and files for a licensed agency. Scales with how much of the paper trail NAYA handles. NAYA never touches the placement fee. Section 03 benchmarks our prices against DataFlow and the government.

Re-priced at 20% under DataFlow: ₱1.95bn a year at full mandate · S$39.5m
Owner: Bobby
Part 3 of 4 · 36 slides

The agency subscription

Every verified Philippine recruitment agency pays a monthly licence fee to be on NAYA. Scales with how many of the 730 agencies sign, not with placement volume.

Year 3, standard tiers: ₱57.2m · S$1.16m
Owner: Bobby
Part 4 of 4 · 17 slides

Where the money is being spent

Kenny’s 38-month information technology projection, Philippine cost only, line by line and month by month in pesos and US dollars — then what one placement costs NAYA.

Philippine cost only: ₱240.2m over 36 months · US$3.80m · ₱375 to serve one placement
Owner: Bobby · unit costs from Kenny
Reference · 19 slides

DataFlow benchmark

How the DataFlow Group charges, what it earns and how much goes to government — including the agreement it already holds with the DMW and the ₱372 it charges an overseas Filipino worker per contract check.

₱372 per OFW contract check · government takes 65% of that transaction
Research: Bobby
The decision

Financial projection

Revenue from whichever ideas and scenarios NAYA adopts, against the real running cost — a fixed platform cost plus ₱375 for every placement, month by month, with every assumption switchable.

Interactive · three price sets · 12, 24 and 36 months · includes the IT cost model
Sources: Kenny, Alan, DMW

The two complete proposals side by side

Year 3 is the comparable year: both models have finished ramping by then. Scenario C in both cases assumes the Department of Migrant Workers requires agencies to work through NAYA — one decision that lifts both. Part 1 joins this table when Shayne's figures arrive.

Year 3 revenuePart 2 — administration fee Part 3 — agency subscriptionBoth togetherWhat it rests on
Scenario A — lowest price, highest acceptance ₱15.4m · S$312,526₱42.9m · S$869,913 ₱58.3m · S$1.18mVoluntary take-up at prices nobody argues about
Scenario B — standard pricing ₱98.2m · S$1.99m₱57.2m · S$1.16m ₱155.4m · S$3.15m277 of 730 agencies sign; NAYA handles part of the paper trail
Scenario C — mandated through DMW ₱482.4m · S$9.79m₱143.0m · S$2.90m ₱625.4m · S$12.69mA DMW mandate NAYA does not control
The two lines sit on one platform, so the running cost is paid once however many revenue lines NAYA runs. That is why the combined column is close to the sum of the two.

What each part is for

Parts 2 and 3 are the presentations

Each is a full deck — the idea in one sentence, the market it prices into, what is charged, three scenarios, annual and month-by-month projections, how many users NAYA would have, what the agency is actually buying, who accepts and who refuses, the dependencies, the assumptions and the sources. Use the arrow keys, or "All slides" to jump. Part 1 is built and waiting on Shayne's figures.

The projection is the decision

It takes whichever revenue lines and scenarios you select and sets them against the real running cost, month by month, over 12, 24 or 36 months — so the question "which one, or which two" has an answer rather than an opinion. Section 01 is the simplified IT cost model: what the platform costs, what one placement costs, and how wrong that figure can be before the answer changes.

NAYA · Philippine monetisation · internal and investor material · built 2026-11-12 · estimates for planning, not audited forecasts.